(1)
STUDI KELAYAKAN SISTEM PEMBUMIAN GEDUNG DENGAN DAYA LISTRIK 41.5 KVA. j. of Power electr. and renew. Energy 2025, 3 (1), 6-10. https://doi.org/10.59811/.