[1]
2025. STUDI KELAYAKAN SISTEM PEMBUMIAN GEDUNG DENGAN DAYA LISTRIK 41.5 KVA. Journal Of Power electric And Renewable Energy. 3, 1 (Jul 2025), 6–10. DOI:https://doi.org/10.59811/.